Remote consultancy · UK wide

Critical spares audit

Work out which automation components genuinely deserve space and money in your stores. We review your controls assets and existing spare holdings, then rank the gaps by production impact, replacement difficulty and commonality across the site.

Remote fixed-scope audits from £295.

What you get

A practical spare-parts strategy rather than a blanket recommendation to hold one of everything.

CRITICALITY

What can stop production?

Separate genuinely production-critical controls from equipment that is duplicated, non-critical or straightforward to replace.

COVERAGE

Where are the gaps?

Compare installed assets against the spares you already hold and flag where there is no realistic recovery option.

PRIORITY

What should you buy first?

Prioritised recommendations based on downtime impact, obsolescence, lead time, interchangeability and likely availability.

Typical deliverables

Critical spares register

Part number, description, installed quantity, current spare quantity, risk level and recommended holding.

Gap analysis

A short list of the items that deserve attention now, instead of burying the important ones in a huge BOM.

Sourcing actions

Recommended source-now, repair, rationalise or migration actions. Automation Outlet can separately quote for parts you choose to source.

How it works

01

Send your information

Asset register, drawings, panel photographs, store inventory or even a rough spreadsheet of machine controls.

02

We review remotely

We group duplicates, identify vulnerable technology and assess where a single failure could leave you exposed.

03

Receive the action list

A clear PDF you can use for maintenance planning, stores rationalisation and spare-parts budgeting.

Spend spare-parts money where it actually matters

Send over your asset or stores list and we'll confirm the scope and fixed price before starting.

Request a critical spares audit

Recommendations are based on the information supplied and should be reviewed alongside your own maintenance, production and purchasing requirements.